UFGS baseline schedules
- Built to UFGS 01 32 01.00 10.
- 60-day preliminary networks, typically within 15 days of NTP.
- Complete logic, calendars, and cost-loaded CLIN balancing.
- DCMA 14-point check and narrative submittal package.
Primavera P6 baselines, cost-loaded monthly updates, and delay analyses prepared for USACE and NAVFAC review.
A rejected preliminary schedule stalls jobsite mobilization. An RMS cost-balancing error can hold up a monthly pay application. We catch those issues before the file reaches the Resident Engineer.
Scheduling support for federal, commercial, and civil contractors who need a clean submittal, not a full-time hire.
Hourly scheduling support is also available. Contact for a quote.
You work directly with the principal. Work is deliverable-based, built to the specification, and checked before it leaves the door.